Goltas Cement Plant, Isparta

Dal Teknik Makina has conducted a process audit for both clinker production lines of Isparta Cement Plant to figure out the bottlenecks of the pyro line in order for Isparta Cement Plant could burn alternative fuels without decreasing its production capacity. Technical inspection covered clinker production line measurements together with the ball type raw mill mechanical inspection for the 1st kiln line. After evaluating the current situation of the plant, together with the measurement results and documents given by the plant, Dal Teknik Makina has prepared a detailed report pointing out the needed improvements the plant has to carry out in order for them to burn alternative fuel and fuel injection points, which was the main concern of the plant.