Cimsa Cement Plant, Mersin

The goal of the project CIMSA Mersin Cement Plant wants to improve its 1st clinker production line by changing the 1st and 2nd stage cyclones for both two strings. Dal Teknik Makina offers “turnkey” replacement of cyclones. The modification project will allow electrical and a slight heat energy reduction by reducing pressure drop and improving separation efficiency of the cyclones.

The main equipment and design offered will be as follows:

• Modification of 1st and 2nd stage cyclones and riser ducts

• Downcomer ducts modification

• Dip tubes, pendulum flaps, meal pipes, splash boxes of the modified cyclones

• Accessories (manholes, poke holes,measuring points etc.)

• Dismantling and erection of the scope mentioned above

• Refractory procurement, demolishing and installation